Tags
Language
Tags
June 2025
Su Mo Tu We Th Fr Sa
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 1 2 3 4 5
    Attention❗ To save your time, in order to download anything on this site, you must be registered 👉 HERE. If you do not have a registration yet, it is better to do it right away. ✌

    https://sophisticatedspectra.com/article/drosia-serenity-a-modern-oasis-in-the-heart-of-larnaca.2521391.html

    DROSIA SERENITY
    A Premium Residential Project in the Heart of Drosia, Larnaca

    ONLY TWO FLATS REMAIN!

    Modern and impressive architectural design with high-quality finishes Spacious 2-bedroom apartments with two verandas and smart layouts Penthouse units with private rooftop gardens of up to 63 m² Private covered parking for each apartment Exceptionally quiet location just 5–8 minutes from the marina, Finikoudes Beach, Metropolis Mall, and city center Quick access to all major routes and the highway Boutique-style building with only 8 apartments High-spec technical features including A/C provisions, solar water heater, and photovoltaic system setup.
    Drosia Serenity is not only an architectural gem but also a highly attractive investment opportunity. Located in the desirable residential area of Drosia, Larnaca, this modern development offers 5–7% annual rental yield, making it an ideal choice for investors seeking stable and lucrative returns in Cyprus' dynamic real estate market. Feel free to check the location on Google Maps.
    Whether for living or investment, this is a rare opportunity in a strategic and desirable location.

    Sap S4: Co "Upa"-Event-Based-Product Costing By Period-Mts

    Posted By: ELK1nG
    Sap S4: Co "Upa"-Event-Based-Product Costing By Period-Mts

    Sap S4: Co "Upa"-Event-Based-Product Costing By Period-Mts
    Published 6/2025
    MP4 | Video: h264, 1920x1080 | Audio: AAC, 44.1 KHz
    Language: English | Size: 11.88 GB | Duration: 20h 40m

    SAP S/4 HANA CO - UPA: Event-Based Product Costing in "Universal Parallel Accounting"-MTS - PRODUCT COST BY PERIOD

    What you'll learn

    SAP S/4 HANA UNIVERSAL PARALLEL ACCOUNTING- Architecture

    Currency types design –> FINSC_LEDGER

    Material Ledger Currencies Setup with 4 ledgers and 5 Currencies

    SAP S4: CO "UPA"-Event-Based-Product Costing by Period-MTS ( base of By Order Scenario)

    Requirements

    SAP S4 HANA CO module required

    Description

    SAP S/4HANA CO – Universal Parallel Accounting (UPA): Event-Based Product Costing by Period in MTS scenario using Product Cost Collector:Universal Parallel Accounting (UPA) enables simultaneous postings across legal, group, and profit center valuations via the Universal Journal (ACDOCA).All cost and value flows from FI, CO, and ML are integrated and stored in ACDOCA without reconciliation needs.Product Costing by Period is used in Make-to-Stock (MTS) or Repetitive Manufacturing scenarios through Product Cost Collectors (PCCs).PCC acts as a single cost object per material/plant/order type for collecting costs across the entire period.Event-Based Costing (EBC) replaces traditional period-end processes by posting costs in real time at each production event.Ledgers such as 0L (Legal), 2L (Group), and others are defined in FINSC_LEDGER, with individual currency types (10, 30, 40, etc.).Up to 5 currencies can be maintained per ledger, supporting multi-currency and multi-GAAP reporting.At goods issue (261 movement), system posts consumption costs to PCC and reduces inventory in all active valuation views.At production confirmation, labor and machine costs (activity types) are posted immediately to PCC per valuation-specific rates.Overheads are posted event-wise based on costing sheet logic using valuation-dependent overhead keys.Work-in-Process (WIP) is calculated and posted in real time for partially completed production, debiting WIP accounts and crediting P&L through BACK FLUSH.At goods receipt , FG inventory is debited and PCC is credited, again in all active ledgers and currencies.Variances are posted instantly once production is complete, eliminating the need for manual settlement at period-end.Costing variants are defined per valuation view, with separate valuation variants, costing types, and overhead keys per ledger.Material Ledger captures actual costs and supports multi-valuation, multi-currency inventory valuation per transaction.Real-time postings ensure legal, group, and profit center profitability analysis is immediately available in CO-PA.No batch jobs are required for WIP calculation, variance analysis, or overhead posting—everything is triggered by events.The system ensures complete integration across FI, CO, ML, and CO-PA in one journal entry with universal traceability.PCC-based costing simplifies cost management in high-volume MTS environments by avoiding order-by-order tracking.UPA with event-based costing allows simultaneous transparency across multiple reporting dimensions with reduced effort.

    Overview

    Section 1: Basic Setting for PRODUCT COST BY PERIOD in "Universal Parallel Accounting"

    Lecture 1 Introduction of SAP S/4 HANA CO: Universal Parallel accounting

    Lecture 2 Organizational structure

    Lecture 3 UPA requires Leading and Non-Leading Ledger setup for Material Ledger

    Lecture 4 Manage GL Master data and General Ledger configuration->OBYC & VKOA-through apps

    Lecture 5 Controlling area & Operating Concern set up and Costing sheet-Design

    Lecture 6 CKMSTART-Production Start up with 5 Currencies & 4 Ledgers-Total 20 values

    Lecture 7 Cost cente with Activity type Plan rate and Standard Cost release and Event base

    Lecture 8 Event based Product costing by order testing scenario

    Section 2: SAP S/4 HANA "UPA"-Event-Based-Product Costing by Period-PRODUCT COST COLLECTOR

    Lecture 9 SAP S/4 HANA "UPA"-Event-Based-Product Costing by Period-PRODUCT COST COLLECTOR

    "Highly recommended for all Finance, Accounts, and Management Accounting professionals, especially for those working as SAP CO module consultants."